Sourced fact
Verify the exact trading business, current registration, relevant EV competence and insurance before contracting.
Installation · UK
Write the requirements before choosing a home chargepoint. Record the exact vehicle, parking arrangement, users, charging pattern, permissions, connectivity and support expectations. Give that brief to a registered competent EV chargepoint installer and require a site-specific survey and itemised written quote. Do not sign until responsibilities for design, network contact, permissions, records, warranty and future support are explicit.
Electrical Safety First: Find a registered electrician
Reviewed
As of 13 August 2026, a UK home-chargepoint purchase should begin with a documented requirement and professional site survey, not a product shortlist alone. E3 allows buyers to verify installer credentials and compare documents, while supply, network and fixed-installation decisions remain professional-only. This checklist collects questions and gives no installation procedure.
Electrical Safety First: Find a registered electrician
Verify the exact trading business, current registration, relevant EV competence and insurance before contracting.
The survey brief should describe the vehicle, parking, users, route, permissions and expected charging use.
Electric Vehicle Consumer Code: EVCC's response to CMA's Invitation to Comment
Supply capacity, maximum demand, network route and fixed-installation design are professional decisions.
Compare the exact equipment, survey basis, included work, exclusions, responsibilities and support in writing.
Electric Vehicle Consumer Code: EVCC's response to CMA's Invitation to Comment
The contract should identify the certificates, notifications, invoice, warranty and model records to be supplied at handover.
Prepare vehicle, parking, permission, usage, connectivity, quote, installer and handover requirements before buying a UK home chargepoint.
Record the exact vehicle and handbook, normal parking orientation, inlet position, usual charging need, other intended vehicles, the people who will handle the cable and any accessibility requirement.
Record who owns the wall, parking space and cable route, whether any area is shared or public, whether landlord or managing-agent consent is needed and whether the site has restrictions requiring written advice.
Verify the business and named electrician, then ask who owns the supply assessment, network route, fixed design, route decision and any change after the survey. Require each answer in the quote.
Ask for the exact model and manual, smart and offline behaviour, connectivity dependencies, itemised scope, exclusions, warranty and support. List the records that must be complete before final acceptance.
Use this checklist to prepare questions, then rely on the documented site survey rather than self-assessing the installation.
Immediate action: Complete the non-technical requirement brief and gather the exact vehicle and property documents.
Record the exact vehicle and handbook, normal parking orientation, inlet position, usual charging need, other intended vehicles, the people who will handle the cable and any accessibility requirement.
Record who owns the wall, parking space and cable route, whether any area is shared or public, whether landlord or managing-agent consent is needed and whether the site has restrictions requiring written advice.
Verify the business and named electrician, then ask who owns the supply assessment, network route, fixed design, route decision and any change after the survey. Require each answer in the quote.