Sourced fact
Installation remains paused until the tenant has written consent from every party controlling the affected property.
Installation · UK
A tenant should obtain written permission from every relevant landlord or property controller before fixed chargepoint work starts. The permission should identify the charger, parking space, route, affected property, costs, maintenance, access, insurance and reinstatement duties. A matching E2 grant screen means possibly eligible for 75% of eligible costs up to £500 in 2026-04-01 to 2027-03-31, never guaranteed approval.
Reviewed
As of 13 August 2026, a UK tenant should obtain written landlord or property-controller consent before any fixed chargepoint or cable-route work. Consent should identify the parking space, route, affected property and ongoing responsibilities. Under E2's 2026-04-01 to 2027-03-31 rule, a matching tenant may be possibly eligible for 75% up to £500, but approval is not guaranteed.
Installation remains paused until the tenant has written consent from every party controlling the affected property.
The consent record should identify the equipment, parking space, route, common areas and responsibility throughout ownership and reinstatement.
Disputed parking, supply, access or property rights are stop conditions for the installation project.
For 2026-04-01 to 2027-03-31, the E2 grant is 75% of eligible costs up to £500 and the result is possibly eligible only.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
Build a written landlord-consent record for a UK rented home before any fixed chargepoint, cable-route or parking-area work starts.
The immediate landlord may not control the parking space, external wall, common route, supply or building structure. Check the tenancy and property records, then obtain written permission from each landlord, freeholder, managing agent or other controller whose property is affected.
The signed record should identify the charger and position, parking space, full route, affected common areas, metering, billing, costs, future access, maintenance, insurance, removal and reinstatement. Conditions should be incorporated into the installer's final written scope.
E2 records a 2026-04-01 to 2027-03-31 grant of 75% of eligible costs up to £500 for qualifying renters and flat owners. A tenant matching the published tree is possibly eligible only; permissions, evidence, eligible equipment, an authorised installer and OZEV's decision remain outstanding, so approval is not guaranteed.
Treat verbal support as an invitation to submit a proposal, not as permission for fixed work.
Immediate action: Send a written proposal identifying the charger, parking space, route and responsibilities to every relevant property controller.
The immediate landlord may not control the parking space, external wall, common route, supply or building structure. Check the tenancy and property records, then obtain written permission from each landlord, freeholder, managing agent or other controller whose property is affected.
The signed record should identify the charger and position, parking space, full route, affected common areas, metering, billing, costs, future access, maintenance, insurance, removal and reinstatement. Conditions should be incorporated into the installer's final written scope.
E2 records a 2026-04-01 to 2027-03-31 grant of 75% of eligible costs up to £500 for qualifying renters and flat owners. A tenant matching the published tree is possibly eligible only; permissions, evidence, eligible equipment, an authorised installer and OZEV's decision remain outstanding, so approval is not guaranteed.