Skip to main content

Regulation · UK

Which public chargepoints must offer contactless payment

Contactless coverage depends on operator size, power and timing. Non-micro operators had a 24 November 2024 deadline for covered public points installed after 24 November 2023 with at least 8 kW per cable and commencement rapid points at least 50 kW. Later-public points get one year; free-to-use points remain outside the duty until charging begins. A same-site terminal may be shared, but an app or QR route alone is insufficient.

Office for Zero Emission Vehicles and Department for Transport: Public Charge Point Regulations 2023 guidance: contactless

Reviewed

Key facts and evidence

Across the UK, as checked on 12 August 2026, contactless coverage depends on a non-micro operator, public access, power and timing. The main deadline was 24 November 2024 for specified new 8 kW-per-cable points and commencement rapid points of at least 50 kW. Later-public and free-use points have separate limits, and one nearby site terminal may serve several points.

Office for Zero Emission Vehicles and Department for Transport: Public Charge Point Regulations 2023 guidance: contactless

Check the operator size, power, installation date, later-public and free-use exceptions before asserting a contactless payment right.

Power and date test

For a non-micro operator, the 24 November 2024 deadline covered new public points installed after 24 November 2023 with at least 8 kW capacity per cable and rapid public points of at least 50 kW already operating when the Regulations commenced.

Later-public and free-use limits

An existing point of at least 8 kW that later becomes public has one year from that change. A free-to-use point remains outside the payment duty until charging begins, and one terminal may serve a nearby site group.

What to do next

Confirm that the point is paid, public, operated by a non-micro business and within the relevant power and timing boundary.

Immediate action: Look for ad-hoc contactless bank-card payment at the point or a nearby terminal serving the same charging site.

  • Do not assert a breach until the free-use, power, date and later-public exceptions have been checked.
  • Do not treat an app or QR payment route alone as the required contactless bank-card facility.

Checks that stay with this vehicle

  1. Check the point and the same nearby charging site for an ad-hoc contactless bank-card terminal.

    You identify whether a bank-card route is visibly offered for the covered point or site group.

    Stop the compliance conclusion if operator size, public status, power, timing or free-use status is unknown.

Do not infer from missing evidence

  • Do not claim that every legacy point outside the covered power threshold must have contactless or that every connector needs its own terminal.

Professional hand-off

  • Use the operator helpline first, then report suspected non-compliance to OPSS after confirming the full coverage boundary.

Questions this record can answer

What does the sourced evidence say about power and date test?

For a non-micro operator, the 24 November 2024 deadline covered new public points installed after 24 November 2023 with at least 8 kW capacity per cable and rapid public points of at least 50 kW already operating when the Regulations commenced.

What does the sourced evidence say about later-public and free-use limits?

An existing point of at least 8 kW that later becomes public has one year from that change. A free-to-use point remains outside the payment duty until charging begins, and one terminal may serve a nearby site group.

Sources