Sourced fact
The contactless duty described here applies to operators that are not micro businesses.
Regulation · UK
Contactless coverage depends on operator size, power and timing. Non-micro operators had a 24 November 2024 deadline for covered public points installed after 24 November 2023 with at least 8 kW per cable and commencement rapid points at least 50 kW. Later-public points get one year; free-to-use points remain outside the duty until charging begins. A same-site terminal may be shared, but an app or QR route alone is insufficient.
Reviewed
Across the UK, as checked on 12 August 2026, contactless coverage depends on a non-micro operator, public access, power and timing. The main deadline was 24 November 2024 for specified new 8 kW-per-cable points and commencement rapid points of at least 50 kW. Later-public and free-use points have separate limits, and one nearby site terminal may serve several points.
The contactless duty described here applies to operators that are not micro businesses.
The 24 November 2024 deadline covered specified new points at least 8 kW per cable and rapid commencement points at least 50 kW.
An existing point of at least 8 kW that later becomes public has one year from that change.
A free-to-use point is outside this payment duty until the operator begins charging for use.
One contactless terminal may serve a group of public chargepoints at the same nearby charging site.
Check the operator size, power, installation date, later-public and free-use exceptions before asserting a contactless payment right.
For a non-micro operator, the 24 November 2024 deadline covered new public points installed after 24 November 2023 with at least 8 kW capacity per cable and rapid public points of at least 50 kW already operating when the Regulations commenced.
An existing point of at least 8 kW that later becomes public has one year from that change. A free-to-use point remains outside the payment duty until charging begins, and one terminal may serve a nearby site group.
Confirm that the point is paid, public, operated by a non-micro business and within the relevant power and timing boundary.
Immediate action: Look for ad-hoc contactless bank-card payment at the point or a nearby terminal serving the same charging site.
Check the point and the same nearby charging site for an ad-hoc contactless bank-card terminal.
You identify whether a bank-card route is visibly offered for the covered point or site group.
Stop the compliance conclusion if operator size, public status, power, timing or free-use status is unknown.
For a non-micro operator, the 24 November 2024 deadline covered new public points installed after 24 November 2023 with at least 8 kW capacity per cable and rapid public points of at least 50 kW already operating when the Regulations commenced.
An existing point of at least 8 kW that later becomes public has one year from that change. A free-to-use point remains outside the payment duty until charging begins, and one terminal may serve a nearby site group.