Skip to main content

Regulation · UK

EV chargepoint grant for households with on-street parking

The on-street household chargepoint grant can cover 75% of eligible purchase and installation costs, up to £500, from 1 April 2026 to 31 March 2027. It is only possibly eligible where there is no private exclusive off-street parking and a permanent cross-pavement solution, eligible EV and required permissions pass a manual check. The result is not an award decision, and the grant does not reserve a parking space or confirm local highways consent.

Office for Zero Emission Vehicles: Electric vehicle chargepoint grants

Reviewed

Key facts and evidence

Across the UK, as checked on 12 August 2026, the on-street household scheme can cover 75% of eligible purchase and installation costs up to £500 from 1 April 2026 to 31 March 2027. It requires no private exclusive off-street parking, a permanent cross-pavement solution, an eligible EV and all relevant permissions. The result is possibly eligible only and needs manual local and scheme checks.

Office for Zero Emission Vehicles: Electric vehicle chargepoint grants

Screen possible eligibility for the on-street household chargepoint grant while preserving local permission and parking limits.

Headline manual screen

The applicant must own or rent and live at the property, have no private exclusive off-street parking, have an eligible EV and propose a permanent cross-pavement solution. Any uncertain input remains a manual check.

Funding formula

The scheme can meet 75% of eligible chargepoint and installation costs up to £500 during 1 April 2026 to 31 March 2027. The £500 figure is a ceiling rather than a fixed award.

Local permission boundary

OZEV scheme conditions do not replace highways, planning or third-party permission. Local policy can prevent a proposed cross-pavement solution, so no national eligibility screen can confirm the site.

No parking-space reservation

A grant contribution does not reserve an on-street parking space. Parking availability remains separate from grant eligibility and installation permission.

What to do next

This screen can say possibly eligible or manual check only; it does not grant highway, planning or parking permission.

Immediate action: Ask the relevant local authorities and an OZEV-authorised installer to verify permissions and scheme conditions before any work.

  • Stop if highways, planning, property or third-party permission is missing or uncertain.
  • Stop if a safe pedestrian route cannot be maintained or the policy review has expired.

Professional hand-off

  • Use the local highways and planning authorities for permissions and an OZEV-authorised installer for the grant process and physical installation.

Questions this record can answer

What does the sourced evidence say about headline manual screen?

The applicant must own or rent and live at the property, have no private exclusive off-street parking, have an eligible EV and propose a permanent cross-pavement solution. Any uncertain input remains a manual check.

What does the sourced evidence say about funding formula?

The scheme can meet 75% of eligible chargepoint and installation costs up to £500 during 1 April 2026 to 31 March 2027. The £500 figure is a ceiling rather than a fixed award.

What does the sourced evidence say about local permission boundary?

OZEV scheme conditions do not replace highways, planning or third-party permission. Local policy can prevent a proposed cross-pavement solution, so no national eligibility screen can confirm the site.

Sources