Sourced fact
The contribution is 75% of eligible costs up to £500, not a fixed £500 award.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
Regulation · UK
The on-street household chargepoint grant can cover 75% of eligible purchase and installation costs, up to £500, from 1 April 2026 to 31 March 2027. It is only possibly eligible where there is no private exclusive off-street parking and a permanent cross-pavement solution, eligible EV and required permissions pass a manual check. The result is not an award decision, and the grant does not reserve a parking space or confirm local highways consent.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
Reviewed
Across the UK, as checked on 12 August 2026, the on-street household scheme can cover 75% of eligible purchase and installation costs up to £500 from 1 April 2026 to 31 March 2027. It requires no private exclusive off-street parking, a permanent cross-pavement solution, an eligible EV and all relevant permissions. The result is possibly eligible only and needs manual local and scheme checks.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
The contribution is 75% of eligible costs up to £500, not a fixed £500 award.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
The current E2 scheme period is 1 April 2026 to 31 March 2027.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
The E2 screen requires no private exclusive off-street parking and a permanent cross-pavement solution.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
An eligible EV and required highways, planning and third-party permissions remain manual checks.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
The grant does not reserve an on-street parking space.
Office for Zero Emission Vehicles: Electric vehicle chargepoint grants
Screen possible eligibility for the on-street household chargepoint grant while preserving local permission and parking limits.
The applicant must own or rent and live at the property, have no private exclusive off-street parking, have an eligible EV and propose a permanent cross-pavement solution. Any uncertain input remains a manual check.
The scheme can meet 75% of eligible chargepoint and installation costs up to £500 during 1 April 2026 to 31 March 2027. The £500 figure is a ceiling rather than a fixed award.
A grant contribution does not reserve an on-street parking space. Parking availability remains separate from grant eligibility and installation permission.
This screen can say possibly eligible or manual check only; it does not grant highway, planning or parking permission.
Immediate action: Ask the relevant local authorities and an OZEV-authorised installer to verify permissions and scheme conditions before any work.
The applicant must own or rent and live at the property, have no private exclusive off-street parking, have an eligible EV and propose a permanent cross-pavement solution. Any uncertain input remains a manual check.
The scheme can meet 75% of eligible chargepoint and installation costs up to £500 during 1 April 2026 to 31 March 2027. The £500 figure is a ceiling rather than a fixed award.