EV chargepoint grant for renters and flat owners

The grant is a contribution, not a guaranteed award or fixed payment. For renters and flat owners, it can cover 75% of eligible purchase and installation costs up to £500 from 1 April 2026 to 31 March 2027. Meeting headline conditions means only possibly eligible; manual eligibility checking and OZEV confirmation are still required before installation.

Office for Zero Emission Vehicles: Electric vehicle chargepoint grants

Reviewed

Key facts and evidence

Across the UK, as checked on 12 August 2026, the renters and flat owners scheme can cover 75% of eligible chargepoint purchase and installation costs up to £500, from 1 April 2026 to 31 March 2027. A resident must fit the occupancy, private off-street parking and eligible-EV conditions. The result is only possibly eligible and needs a manual scheme check before work.

Office for Zero Emission Vehicles: Electric vehicle chargepoint grants

Screen the dated renters and flat owners chargepoint grant for possible eligibility without treating the £500 cap as an award.

Possible eligibility screen

The E2 tree requires a flat owner-occupier or tenant, a private clearly defined off-street parking space the applicant can lawfully use, and an eligible EV. Any unresolved input needs a manual check.

Percentage and cap

The scheme can contribute 75% of eligible purchase and installation costs, limited to £500. A lower eligible cost produces a lower contribution; £500 is a ceiling rather than a fixed award.

Effective period and process

The current E2 window is 1 April 2026 through 31 March 2027. OZEV confirmation, an eligible chargepoint and an OZEV-authorised installer are required before installation.

What to do next

This page can return possibly eligible or manual check only; it does not make an OZEV award decision.

Immediate action: Check occupancy, parking rights, vehicle eligibility, prior claims and third-party permissions before asking an authorised installer to begin the scheme process.

  • Stop if parking rights, property status or vehicle eligibility cannot be evidenced.
  • Stop if installation has already started or the source review and scheme dates have expired.

Professional hand-off

  • Use an OZEV-authorised chargepoint installer for the claim and installation, and obtain landlord, freeholder or managing-agent permission where applicable.

Questions this record can answer

What does the sourced evidence say about possible eligibility screen?

The E2 tree requires a flat owner-occupier or tenant, a private clearly defined off-street parking space the applicant can lawfully use, and an eligible EV. Any unresolved input needs a manual check.

What does the sourced evidence say about percentage and cap?

The scheme can contribute 75% of eligible purchase and installation costs, limited to £500. A lower eligible cost produces a lower contribution; £500 is a ceiling rather than a fixed award.

What does the sourced evidence say about effective period and process?

The current E2 window is 1 April 2026 through 31 March 2027. OZEV confirmation, an eligible chargepoint and an OZEV-authorised installer are required before installation.

Sources